In northern field production, the irrigation season ends and the system may stand idle for months. What happens during that idle period decides much of next season's repair bill. Water left in a pump casing or a filter housing has nowhere to go when the first hard frost arrives, and fertilizer solution left in a line becomes a corrosive residue. Maintenance and drainage before winter are what make the system start cleanly in spring.
Water supply: pump station and reservoir
Use the off-season for the annual inspection of the pump station and reservoir. Clear silt, flush it out, then drain the pipes and seal the valves and wells. Clean the water marks from the pump housing before they turn into rust. At the end of the season, open the drain plug under the pump casing and let the body drain completely; this is what prevents a cracked pump in a hard winter. Oil the exposed surfaces.
Filtration: where freeze damage concentrates
The head filters are most exposed to freezing, because they hold water by design. A centrifugal filter with automatic backwash is cleaned by opening the drain valve on the dirty-water tank until clear water comes out; then drain the housing. Sand media filters need a full backwash at season end at a controlled rate, and the media should be disinfected with chlorine to limit microbial growth; then drain through the lower port and clean and drain the small filter above. Disc filters are backwashed, checked for differential pressure and drained through the small filter port before the discs are removed for separate washing. Trapped water can crack a housing, so drain it completely. Drain the pressure-reducing valve on the filter manifold through its small screw.
The dosing machine, field lines and valve groups
At season end, check the inlet and outlet connections and their seals, clean off deposits, and drain the machine and its pipes. On most units, open the feed pump drain plug, loosen the connections around the solenoid valve and Venturi line, and loosen the joints between the machine and the main pipe. Clean the filter at the stock tank connection and drain the line through the small connector beside it. Close the tank valve before opening the filter, or the fertilizer solution follows the water out; leftover stock solution can stay in a closed tank.
Start the system once more to flush the mains and laterals. At the far end of each drip line, open the end plug and let the water run until it is clear. Then drain the mains and sub-mains: open the low-point valves and use the terrain and gravity where possible, or blow the lines through with an air compressor, with all air valves closed first. At each valve group, open the drain ports above the butterfly, ball and solenoid valves, break the flanges and unions, and drain the elbows where water collects.
How to plan the shutdown
- Schedule the work for a dry day at season end, not after the first frost.
- Inspect and drain the pump station and reservoir; clean and oil the pump housing.
- Backwash and drain every filter housing, including the pressure-reducing valve.
- Drain the dosing machine, feed pump, Venturi line and the stock tank filter.
- Flush the drip lines and drain the mains, sub-mains and valve groups.
The work takes a day and is easy to postpone. Left undone, it becomes the most expensive repair of the winter: a split housing, a cracked pump or a burst pipe under a frozen line. Done properly, the system comes back in spring with its accuracy intact.